Project Description

As a subconsultant to Parsons Transportation Group, R.M. Chin is providing Construction Inspection and Office Engineering Services on the Jane Addams Memorial Tollway (I-90) Smart Corridor project from Mile Post (MP) 53.8 to MP 78.9 (Elgin Plaza 9 to the Kennedy Expressway). The R.M. Chin scope of work involves the installation of the Intermediate Power Distribution and Communication System (IPDC) facility building; testing and calibration of various electrical equipment inside the IPDC; installation of Emergency Natural Gas Generators, as well as testing and commissioning; construction and installation of Intelligent Transportation System (ITS) equipment cabinets; erection and installation of Lane Control Signs (LCS) for active traffic management; installation and calibration of Closed Circuit Television Cameras (CCTV); erection and installation of Dynamics Message Signs (DMS); installation, testing, and calibration of Microwave Vehicle Detection System (MVDS); and installation, testing, and commissioning of Weigh-in-Motion (WIM). R.M. Chin is also coordinating lane closure and traffic control measures with the Tollway, as well as assisting with payment processing, document control, and change management support.